After UC Davis took over the Renewable Energy Anaerobic Digester (READ) Biodigester facility in 2017, staff ramped up efforts to increase usage of the facility. They started by investigating removing ammonia from the digestate (the material remaining after the anaerobic digestion of a biodegradable).
This past March and April, water conservation projects were completed by the Facilities Management Plumbing Shop in TB 183, Poultry House X, and Poultry House Y room 3. The team installed new water emitter systems in the three buildings. The new systems provide water when it is needed by the animals, rather than water constantly flowing. James Medeiros, Gary Fitzpatrick, Chris Persons from the Plumbing Shop worked to install this new system. It took some planning and creative thinking to route and support these lines systems.
We are proud to announce Shields Library is officially certified as a LEED Green Building! As of May 2021, Shields earned the LEED Gold Certification in the Existing Buildings: Operations & Management category with 73 out of 110 total points.
On the southwest corner of Maddy Equine Lab, wooden striped racing poles are scattered around the western exterior of the building. These wooden poles were originally used as markers at the TanforanRacetrack in San Bruno. Due to the age and historical importance of the poles, it’s a priority to ensure they’re kept intact and well preserved. When Chase Fowler, from the Building Maintenance Services (BMS) PaintShop, was assigned the task of preserving the poles, he knew the importance of keeping these wood poles intact and was excited about the task!
In April 2020, Facilities Management (FM) was notified by Design Construction Management (DCM) of several buildings on the Davis campus that were slated to be decommissioned. The notification allows our teams the option to identify any equipment or materials that might be useful to use for future projects.
In 2016, Facilities Management (FM) started a venture with the University of California, Office of President (UCOP) to create a UC-wide program to evaluate every significant piece of real property on campuses. This program would evaluate the property’s current condition, potential failure and mission-critical-importance level. Today, ten UC campuses utilize this program to have an accurate assessment of Deferred Maintenance (DM) needs for all UC buildings and infrastructure including equipment based on actual asset conditions.
It is all about creativity and communicating for third year, Communications and Professional Writing student Cassandra Ng. She began working in Operations Support as the Communications Intern in November 2020. Her associate of arts degree in journalism allowed her to hit the ground running at a socially distanced pace and quickly become a valuable asset to the team. Since then she has been using her talents to create billboard slides, creating and editing newsletter articles, and revamping the Facilities Management social media pages.
In June 2020, the Toxic Pollutant Health Research Laboratory Building earned LEED Gold Certification with 72 out of 110 total points. This was a collaborative project with contributions from the teams within Facilities Management, the TPHRL building occupants and facility managers, the Green Building Team, and more!
Water penetration and disintegrating stucco is no longer a problem at the Foundation Plant Services building thanks to deferred maintenance funding and a dedicated Facilities Management team.