Birds eye view of facilities staff working on a roof on campus.

Roof Repairs

Roof Repairs

Updated Fall 2024

UC Davis Facilities Management is undertaking a large-scale initiative to repair and/or replace the roofs of our aging buildings. This work involves the careful evaluation of each building's condition, age, and usage. Our expert staff first assess the urgency of repairs needed, factoring in human and animal safety concerns, the priority for protecting research, and how to best avoid disrupting student instruction. With proper maintenance, roof replacements can last approximately 25 years, making these repairs a vital long-term investment. Given the 1200-plus buildings we maintain, prioritizing roof repairs involves balancing immediate needs with limited funds.

Explore this page to learn about roof repairs, ongoing projects, and the buildings next in line for improvements. 

Please note that this list is not exhaustive. There are many more buildings on our radar as needing roof work, but because we cannot always predict when these projects will begin and priorities often shift, we welcome you to review the FAQ on this page and/or direct your questions and concerns to representatives from our Customer Experience Center

Roof Repair FAQ

  • How do I handle an urgent roof repair need?
  • For urgent requests, contact our Customer Experience Center at (530) 752-1655 or facilities@ucdavis.edu. Learn more. These types of issues threaten health and safety, reseach, or affects student instruction.
  • How do I handle a non-urgent roof repair issue?
  • For non-urgent requests, submit a work order through UC Davis' Aggie Workorder system. You’ll need access to IBM Tririga. If you don’t have access, call the Customer Experience Center at (530) 752-1655 to register.
    You can also send an email to facilities@ucdavis.edu. Make sure to include: Your full name and phone number; full name and phone number of someone on site who can be contacted; location where the problem has occurred; description of the problem; and photographs of the problem.
  • How are roof repairs prioritized?
  • Safety Concerns: Buildings that present immediate safety risks, such as those with structural integrity issues or significant water intrusion, are addressed first to ensure the safety of occupants and prevent further damage.
    Budget and Resources: Budget availability always play a role. Many roof repairs take advantage of deferred maintenance, or DM, funding. This year (2024) and next (2025) we expect limited DM funds.
    Building Usage and Impact: High-use and mission-critical buildings—such as classrooms, research facilities, labs, and student housing—are given priority over lower-traffic or non-essential structures. The goal is to minimize disruptions to the campus’s core functions.
    Condition and Age: Older roofs and those showing visible signs of deterioration or nearing the end of their expected lifespan are prioritized, especially if they’re more prone to failure during adverse weather conditions.
    Weather Sensitivity: Repairs are often scheduled based on the season. Some buildings may require faster attention if the roof damage could worsen during rainy or stormy conditions, leading to leaks or other major problems.
  • What can I do now to prepare for the rainy season?
  • Continue to report leaks or signs of water damage immediately through our work order system. Keep an eye on areas that may be susceptible to leaks and avoid storing valuable items directly under them.
  • Where do leaks come from? (It may not be your roof!)
  • Damaged roofs can be the culprit, but not always. Leaks can also come from windows or other infrastructure problems. Our roofing team can conduct assessments to determine where a leak is coming from and implement temporary measures to prevent further damage while a permanent fix is scheduled. Leaks may originate from various building components like deteriorated pipes, fixtures, valves and research equipment. When a leak is reported, our technicians conduct a bit of detective work to identify the source and determine what repairs are needed.
  • What if something smells funny?
  • Water damage frequently causes mold and odors. If something smells “off” and you see visible signs of mold, contact Facilities Management using a non-urgent method. If there are health or comfort concerns linked to the water incursion, contact Environmental Health and Safety by phone 530-752-1493 or email help@ucdavis.edu.

    If there’s odor with no ongoing water incursion and no signs of mold, contact Environmental Health and Safety (EHS) by phone 530-752-1493 or email help@ucdavis.edu. They’ll identify the source of the problem and advise further action.

  • What does our roof repair team do?
  • Roofing staff, part of the Building Maintenance Services structural trades team, handle a wide range of services including roof repairs, re-roofing, new installations, and inspections for all types of roofing systems. Their expertise includes installing mechanical units on existing roofs, cleaning drains, gutters, and downspouts, and providing waterproofing solutions. They also conduct thorough roof assessments, plan and execute repairs with minimal disruption to campus activities in addition to carrying out routine maintenance requests. If immediate repairs are needed, they can implement temporary measures to prevent further damage while a permanent fix is scheduled. Learn more about this unit and the people leading it. 
     

Roof Repairs 2020-2025

BuildingStatusCompletion / 
Expected Completion
Funding sourceCost
1633 Da Vinci CourtIn ProgressFall 2024Deferred Maintenance$297K
Activities and Recreation CenterComplete2021Departmental$21K
Animal Resource Services X6Complete2021General$13K
Bainer Hall (North Wing)Complete2022Deferred Maintenance$670K
Bainer Hall (Lower south and middle sections)Upcoming PriorityTBDTBDTBD
Bodega Bay South LabCompleteSummer 2024Deferred Maintenance$17K
Briggs Hall*Complete2022Deferred MaintenanceNA**
Center for Health & Environment (Animal House 2)Complete2023Deferred Maintenance$83K
Center for Health & Environment (Office & Laboratory)Complete2020Deferred Maintenance$170K
Chemistry*Complete2024Seismic Deferred MaintenanceNA**
Cowell BuildingUpcoming PriorityTBDTBDTBD
Dobbins Baseball ComplexComplete2021Departmental$8K
Environmental Services Facility HeadquartersComplete2020Deferred Maintenance$524K
Equine Athletic Performace LabComplete2021Work covered under warrantyNA
Facilities ShopComplete2021General $117K
Fire & Police BuildingComplete2020Deferred Maintenance$169K
Gallagher Hall (2023)Complete2023Deferred Maintenance$50K
Gallagher Hall (TBD)Upcoming PriorityTBDWork covered under warrantyNA
Green HallCompleteSummer 2023Deferred Maintenance$98K
The GroveComplete2020Deferred Maintenance$304K
Haring Hall (West section)Complete2022General$80K
Jungerman Hall*In Progress2025Seismic Deferred MaintenanceNA**
Katherine Esau Science HallIn ProgressWinter 2025Deferred Maintenance$63K
Mann Laboratory*CompleteSummer 2024Seismic Deferred MaintenanceNA**
McClellan Nuclear Research CenterComplete2021General$25K
Medical Sciences 1B In ProgressWinter 2025Deferred Maintenance$80K
Mondavi Administration BuildingCompleteSummer 2024Deferred Maintenance$93K
Mrak HallComplete2020Deferred Maintenance$276K
Music Building (2020)Complete2020Deferred Maintenance$55K
Music Building (2021)Complete2021Deferred Maintenance$42K
Music Building (2023)CompleteSummer 2023Deferred Maintenance$143K
Nelson Hall*Complete2022DepartmentalNA**
Primate Administration BuildingUpcoming PriorityTBDTBDTBD
Quad Parking StructureComplete2020Deferred Maintenance$5K
Robbins HallIn progress2024Deferred Maintenance$450K
Schalm HallUpcoming PriorityTBDTBDTBD
School of Education (Main Building)Complete2021Deferred Maintenance$230K
School of Education (South Section)CompleteSummer 2024Deferred Maintenance$87K
Segundo Dining CommonsComplete2022Departmental$35K
Segundo Dining CommonsCompleteSummer 2023Departmental$17K
Telecom Upcoming PriorityTBDTBDTBD
Tercero Residence Hall (Mechanical Building)Complete2022Departmental$59K
UC Davis Health Stadium (North building)Complete2021Departmental$151K
UC Davis Health Stadium (Press box)Complete2021Departmental$137K
University Credit Union CenterIn Progress2025DepartmentalTBD
Urban Forestry BuildingComplete2020Deferred Maintenance$90K
Welcome CenterUpcoming Priority TBDWork Covered Under WarrantyNA
Wellman HallComplete 2022Deferred Maintenance$341K
Wickson HallUpcoming PriorityTBDTBDTBD
Young Hall*In Progress2025Seismic Deferred Maintenance TBD

* Project managed by Design and Construction Management.
** Roof work included as part of a comprehensive project bid.